SUGAR

Mill rolls, shafts and gearing stripped, machined, hard surfaced, reassembled and coated in the one complex, with breakdown response through the crushing season.

Large grooved cylindrical component set up on the table of the green Froriep CNC vertical borer in the machine shop
A large industrial gearbox assembly with helical gear sets and machined pinion shafts in the workshop

MILL COMPONENTS, ONE BUILDING

We support the region's sugar mills through crushing season and the maintenance window, with mill shutdowns, breakdown response and the manufacture and repair of milling components, rolls, shafts and gearing.

Fabrication, machining, fitting and painting sit under one roof, so a component is stripped, assessed, measured, repaired, reassembled and coated without leaving the complex or waiting on an outside trade. Nothing goes back together on assumption, every part is measured and recorded first.

Where a surface is worn rather than broken, ABClad, our patented hard surfacing process, reclaims it instead of replacing the part, and the computerised gas fired oven stress relieves the assembly after heavy welding.

PLANT FOR ROLLS, SHAFTS AND GEARING

CNC vertical borer

5 m diameter, 18 t table

Twin post vertical borer

3.5 m diameter, 18 t table

CNC lathes

Workpieces over 40 t

Gear cutting

Internal and external gears to 5.5 m diameter

Gas fired oven

6.5 by 5.5 by 2.7 m high, to 800 °C

Wear reclamation

ABClad hard surfacing, submerged arc, TIG and MIG

Finishing

Blasted and coated in the same building before dispatch

Turnaround

All repairs in house, 24/7, seven departments
Mobile crane hoisting a dragline chain link above the Curragh dragline unit 303

CREWS AT THE MILL, TRANSPORT IN BETWEEN

Sugar mills are named work for our Field Division, alongside draglines and power stations. We supply shutdown and project crews, and under Queensland labour hire licence LHL-01983-S5B8T we supply planners, supervisors, relief personnel and trades where you need people rather than a package.

Our transport division moves the component both ways, 24/7, with low loaders to 50 tonnes, heavy rigid tilt trays, prime movers on flat and drop deck trailers, and Franna cranes for the lift at either end.

The Paget complex takes dimensional loads to 10 m wide, 10 m high and 35 m long, so an outsize mill assembly comes through the door in one piece.

RELATED WORK

Ready to talk?

Send the drawing, the failed component or the breakdown. Seven departments and the field division respond from one complex at Paget.

07 4952 344424/7 emergency call out