Principal contractor on a six week ROM shutdown at BMA Peak Downs, five years of monthly maintenance at Coppabella, LTI free, and the full Paget workshop behind every crew, 24/7.

PRINCIPAL CONTRACTOR, NOT ONLY A LABOUR SUPPLIER
Our Field Division takes construction, shutdown, plant maintenance and breakdown work across the Bowen Basin and beyond. ABC has been principal contractor for a six week ROM shutdown at BMA Peak Downs, and has held five years of monthly maintenance at Coppabella, LTI free.
In situ hoist and drag drum rebuilds and Marion 8750 propel gear case change outs are done on the machine, on your schedule. Every job is backed with the same QA documentation we apply in the shop, so what was measured in the pit is recorded and signed off.

THE PLANT WE WORK ON, AND THE CREWS WE SEND
Field crews bring the full capability of the Paget workshop to your site, 24/7. Where you need people rather than a package, ABC holds a Queensland labour hire licence, LHL-01983-S5B8T, and supplies planners, supervisors, relief personnel and trades.

- Electric draglines & face shovels
- Hydraulic excavators
- Coal processing plants
- Blast hole drill rigs
- Sugar mills
- Power stations
- Shipping (on and offshore)
- Shutdown & project crews
SCOPE & CAPACITY
Shutdowns
Principal contractor, six week ROM shutdown at BMA Peak DownsMaintenance record
Five years of monthly maintenance at Coppabella, LTI freeIn situ rebuilds
Hoist and drag drum rebuilds on the machineGear case change outs
Marion 8750 propel gear casesLabour hire licence
LHL-01983-S5B8TLabour supplied
Planners, supervisors, relief personnel and tradesCrews
Shutdown and project crewsAvailability
24/7, backed by the Paget workshop


RELATED WORK
Transport & Cranes
The float and the Franna that move a change out component to the pad run out of the same 24/7 division.
OpenFitting
A gear case pulled on site comes back to jacking presses rated to 600 tonnes, then goes out again as a rebuilt assembly.